【11】

Bucklyst Vic 64 UNITS APARTMENTS

  • Australia
  • 2023
Get A Free Quote

Bucklyst ,Vic 64 UNITS APARTMENTS

BUCKLEY_ST_APT_2
BUCKLEY_ST_VIC_2
BUCKLEY_ST_NOBLE_PARK_INSTALLATION
BUCKLEY_ST_VIC

Factory Direct Selling

SEE ALL Factory Direct Selling
  • index_saleIcon_1
    Market
  • index_saleIcon_2
    Measurement
  • index_saleIcon_3
    Material selection
  • index_saleIcon_4
    Design
  • 5-Design-confirmation
    Design confirmation
  • index_saleIcon_6
    Material calculation
  • 7-Rendering
    Rendering
  • 7-Rendering
    Intelligent ERP management system
  • 9-CNC-board-cutting
    CNC board cutting
  • 10-Edge-banding
    Edge banding
  • 11-Hole-drilling-management
    Hole drilling management
  • 13-Sorting-and-trial-assembly
    Sorting and trial assembly
  • 14-Color-repair-and-board-cleaning
    Color repair and board cleaning
  • 15-Packaging
    Packaging
  • 16-Warehousing
    Warehousing
  • 17-Loading
    Loading
  • 18-Installation
    Installation
index_saleImg_1

Negotiation


1.Online consultation-media platform,phone call

2.Negotiation at our company-make proposal based on requirement

3.Confirm intention-pay deposit,measurement service appointment

4.Measurement at site-Designer go to site to measure and discuss, take photo for record

Measurement

Measurement


For kitchen measurement:include the ceiling height, distance between walls, doors(include frame stopper),window height and width(include sill), window to floor/ceiling/wall corner distance, as well radiator, pipes, sockets,switches and drainage location, and exhaust fan outlet diameter

Material-selection

Material selection


Color, material, handle etc, build your dream kitchen

Design

Design


1.Preliminary design-make drawing based on measurements

2.Discuss for modification-discuss with customer,optimize according to customer's requiement

3.Confirm drawing-make drawing for water pipe and electric wires based on confirmed drawing

4.Measure again-After Door frame, wall tiles, flooring, ceiling etc are completed, measurement the twice time

Design_confirmation

Design confirmation


1.Confirm details-making production drawing, customer to confirm color, material, hardwares,sizes.

2.Sign contract-drawing,quotation,contract,all documents in duplicate,sign and stamp by both sides

3.Production-lead time is subject to contract

ERP

Material calculation


Enter all measurements in the software, choose house layout, then choosethe color and material you want to creat the house

effect-picture

Rendering


After complete the kitchen rendering, you will get it in PDF format

ERP2

Intelligent ERP management system


The production process is digitized, more efficient and more accurate, and the error rate is kept low in all steps of

Front-end sales system + SU design software + ERP production system

One-click output of production data

The system optimizes the typesetting of CNC, edge banding, hole arrangement, sorting, packaging, hardware and other data

CNC board cutting


1. Automatic loading and unloading platform

2. Straight row 16 tool magazine

3. Multi size machining

4. Flexible cutting

Electronic saw cutting

1. The system can interface with the order splitting software, with built-in optimization layout, saving materials and reducing waste

2. Batch cutting: particle board, plywood, MDF, OSB, etc

Edge_banding

Edge banding


1. Door panel: PUR door panel edge sealing

2. EVA cabinet edge sealing

3. PET door panel laser edge sealing

4. 45 degree handleless drawer panel, door panel edge sealing

Hole drilling management


1. One processing can complete all six hole positions, achieving fast and efficient drilling and milling work

2. The screw transmission accuracy is higher, with an error within 0.05-0.1mm, and the cumulative error is small, which is higher than the rack transmission accuracy

3. Double sided alternating slotting: synchronous alternating slotting of the upper and lower sides, greatly improving production efficiency

4. Irregular machining: Cooperate with various cutting heads/drills to punch/slot/mill the sheet metal

Sorting_and_trial_assembly

Sorting and trial assembly


1. Sort by order/unit cabinets' number using self-developed ERP system

2. Print labels for the board which label is missed or damaged to prepare for the next packaging step

3. To supplement orders with insufficient boards

4. Trial assembly: After assembly, measure the dimensions of the cabinet and board components, check the hole positions, and compare whether the actual object is relative to the drawings

Color_repair_and_board_cleaning

Color repair and board cleaning


1. Clean the board with board washing water

2. Check if there are scratches/damages on the boards

3. Use a color pen to repair the board

4. Replace the faulty boards

Packaging

Packaging


1. Using the ERP packaging system to scan codes,

2. Print packaging labels

3. Packing standard of panel: thick paper+foam+corner protection

4. Packing standard of fragile glass: thick paper+foam+corner protection+wooden creates

5. Baking paint packaging standard: thick paper+film covering+foam+corner protection

Warehousing

Warehousing


After packaging, deliver to the finished product warehouse, scan the code, count and enter the warehouse

Loading

Loading


Scan code, count and load

kitchen-cabinet-installation

Installation


Provide professional technical personnel for on-site installation

Project

Bucklyst ,Vic 64 UNITS APARTMENTS

Type

Apartment

Quantity

WE SUPPLIED:
• KITCHEN CABINET
• SHAVING CABINET
• VANITIES
• PANTRY
• LINENS

Location

 Australia
Share this Case study