2.Negotiation at our company-make proposal based on requirement
3.Confirm intention-pay deposit,measurement service appointment
4.Measurement at site-Designer go to site to measure and discuss, take photo for record
Measurement
For kitchen measurement:include the ceiling height, distance between walls, doors(include frame stopper),window height and width(include sill), window to floor/ceiling/wall corner distance, as well radiator, pipes, sockets,switches and drainage location, and exhaust fan outlet diameter
Material selection
Color, material, handle etc, build your dream kitchen
Design
1.Preliminary design-make drawing based on measurements
2.Discuss for modification-discuss with customer,optimize according to customer's requiement
3.Confirm drawing-make drawing for water pipe and electric wires based on confirmed drawing
4.Measure again-After Door frame, wall tiles, flooring, ceiling etc are completed, measurement the twice time
Design confirmation
1.Confirm details-making production drawing, customer to confirm color, material, hardwares,sizes.
2.Sign contract-drawing,quotation,contract,all documents in duplicate,sign and stamp by both sides
3.Production-lead time is subject to contract
Material calculation
Enter all measurements in the software, choose house layout, then choosethe color and material you want to creat the house
Rendering
After complete the kitchen rendering, you will get it in PDF format
Intelligent ERP management system
The production process is digitized, more efficient and more accurate, and the error rate is kept low in all steps of
Front-end sales system + SU design software + ERP production system
One-click output of production data
The system optimizes the typesetting of CNC, edge banding, hole arrangement, sorting, packaging, hardware and other data
CNC board cutting
1. Automatic loading and unloading platform
2. Straight row 16 tool magazine
3. Multi size machining
4. Flexible cutting
Electronic saw cutting
1. The system can interface with the order splitting software, with built-in optimization layout, saving materials and reducing waste
4. 45 degree handleless drawer panel, door panel edge sealing
Hole drilling management
1. One processing can complete all six hole positions, achieving fast and efficient drilling and milling work
2. The screw transmission accuracy is higher, with an error within 0.05-0.1mm, and the cumulative error is small, which is higher than the rack transmission accuracy
3. Double sided alternating slotting: synchronous alternating slotting of the upper and lower sides, greatly improving production efficiency
4. Irregular machining: Cooperate with various cutting heads/drills to punch/slot/mill the sheet metal
Sorting and trial assembly
1. Sort by order/unit cabinets' number using self-developed ERP system
2. Print labels for the board which label is missed or damaged to prepare for the next packaging step
3. To supplement orders with insufficient boards
4. Trial assembly: After assembly, measure the dimensions of the cabinet and board components, check the hole positions, and compare whether the actual object is relative to the drawings
Color repair and board cleaning
1. Clean the board with board washing water
2. Check if there are scratches/damages on the boards
3. Use a color pen to repair the board
4. Replace the faulty boards
Packaging
1. Using the ERP packaging system to scan codes,
2. Print packaging labels
3. Packing standard of panel: thick paper+foam+corner protection
4. Packing standard of fragile glass: thick paper+foam+corner protection+wooden creates